Spend by project

Once the projects are assigned, looking the figure up is a matter of filtering. There are two places to filter by project, the document lists and the dashboard, and each answers a different question.

Document lists › the Project filter · and the Dashboard

Two places, two questions

WhereWhat it answers
The document listWhich particular documents belong to this project.
The dashboardWhat this project adds up to and how it is moving.

The list is for working, checking, correcting, sending; the dashboard is for looking. They get used at different moments.

The filter on the lists

The document lists carry a project filter alongside the rest. It is available on purchase invoices, delivery notes, sales delivery notes and transport invoices, among others.

Applied, the list shows only that project's documents, with their amounts. It combines with the other filters, date, supplier, status, and that is where its real value lies: what was spent on this job with this supplier in March.

The totals you see are those of the rows shown, so the filter is also the way to add things up.

The filter on the dashboard

The dashboard has a project selector of its own. Applied, its figures refer to that project alone: the amounts, the counts and the trend.

It is the view for the management question, how is this job going, as against the list's detailed view.

Taking it to Excel

When a project's spend has to be set against something else, a budget, a forecast, the way is to export the filtered list and do the arithmetic outside.

It is also how you split spend between several projects when a document belongs to more than one and the detail was not taken down to the lines.

When the figure is not complete

Three reasons a project's spend can come out below the real figure:

Before treating a figure as sound, check how many documents in the period have no project assigned. That is the gap the spend that will not add up escapes through.

A routine that works

  1. As you upload, choose the project on the upload screen whenever the batch is all one project.
  2. Once a week, filter the list on an empty project and assign whatever is left in bulk.
  3. At month end, go over the dashboard by project and set it against what you expected.
  4. When something does not add up, drop down to the filtered list and find the particular document.

Step two is what holds the other three up: without it, the figure is always behind reality.

What this cannot tell you

Worth knowing what it does not do:

For any of those three, the way is to export and work on it outside.

Things that come up

What you seeWhyWhat to do
The project's spend is lower than expected There are documents with no project assigned. Filter on an empty project and assign them in bulk.
A document shows under a project it does not belong to It was assigned in bulk along with others. Correct it on the document's header.
The project filter is not on a list Not every document type offers it. Use the dashboard, or export and filter in Excel.
The dashboard and the list give different figures The same period or the same document type is not being applied. Match the filters before comparing.
A document has to be split between two projects The header takes only one. Assign a project on each line, or split it outside in a spreadsheet.

↑ Back to top

Last reviewed: 11 September 2026 · The Dijit.app team